Northstar on 29 September: new districts, new bottlenecks
Listen to this post7 min
Created by AI from the text of this post and read by a synthetic voice; not a word-for-word version, and it may contain errors.
Loading…
Created by AI from the text of this post and read by a synthetic voice; not a word-for-word version, and it may contain errors.Position and speed stay in this browser and are sent nowhere.
The recording could not be played. Open the audio file
Northstar ended the observed day with about 1.1 million residents. That is not a midnight balance, and the series has documented measurement gaps. The low came shortly before 01:00 UTC, and in the afternoon the population fell again before rising after new construction phases.
Population over the measured course of the day. Residents from the published series, 38 readings from 28 September 2026 to 29 September 2026.
| Observation | Earlier reading | Later reading | Note |
|---|---|---|---|
| Residents | 1,085,022 at 22:27 UTC the evening before | 1,101,188 at 21:11 UTC | +16,166 between the two endpoints; low of 1,078,844 at 00:57 UTC; 38 points and 20 documented measurement gaps |
| Unemployment rate | 12.74% at the first population point | 11.04% at the last matching labour-market reading, 19:17 UTC | Only 21 of 38 points carry this index; the last value precedes the last population point. |
| Unemployment rate, walk-through after the western industrial area | 12.76% | 10.76% | Temporary fall; 2,839 people employed at the walk-through |
| Southwest industrial area | not reported | 98% built up | 755 people employed |
| Southern field, 15:00 UTC | not reported | 77 buildings under construction, 20 finished | After the first stage |
| School reserve | about 10–12% at 19:12 UTC | 28/23% for two school levels at 21:10 UTC | Observed after a series of expansions; a longer-term effect is open. |
Jobs and housing: two different brakes
At the start the building agent reported roughly 42,000 missing jobs and no free industrial or office plots. A new industrial area in the west followed. A later walk-through found people employed there and an unemployment rate that had temporarily fallen by two percentage points. A smaller industrial area in the southwest was later almost fully built up and employed several hundred people. This shows actual construction and employment, but it does not show what share of the city-wide trend is due to these areas alone. Warnings about a shortage of unskilled workers were a reminder not to judge jobs by their number alone.
The afternoon decline turned attention to housing: with high housing demand, only about 80 free residential plots were reported. The building agent then opened the southern field in two steps. First came roads, utility connections and service buildings, with zoning cells designated. The second stage added roads, a northern bridge, water pumps and more zoning cells; the reported water reserve rose by six percentage points. A planned bridge connection was not built because of unfavourable junction geometry, and several roads could not be widened because of existing buildings. Accessibility remains an open question. The later rise in population came after the construction work; no isolated proof of effect exists for the southern field.
Further phases followed in the south, southwest and the western field. In the west the building agent reported more zoning, twelve groundwater pumps and a water reserve of about 50%. In the evening came school expansions and a new section in the northwest. At 21:12 UTC growth was still assessed as stalling; an investigation of growth drivers had been commissioned, and its result was not available at the end of the report period.
Access and services
The main metro line first received a change of direction and additional stops. Later it was extended eastward by four stations. A readback confirmed active trains after the extension. Before the measure, a traffic scan described more than half of the checked road segments as congested. A directly comparable scan after the extension is missing, so the extra rail is a documented intervention but not yet evidence of less road congestion.
Post, cemeteries, water and education were checked repeatedly. By 15:00 UTC the post offices were no longer full after earlier reported overload. Recurring cemetery swaps kept burial capacity operational but are no final clearance of local backlogs. Water and sewage stood below half of capacity in reserve in the later walk-through. Differing measurement times and demand swings limit causal comparisons.
CPU time at normal speed
In the morning the game was set to speed 1, with the instruction to lower CPU cost without losing population. From that point, CPU measurements cannot be compared with the earlier speed-4 values as equivalent test windows. Four alternating tests at speed 1 gave the following means:
| Setting | CPU seconds per 1,000 frames | Frames per second |
|---|---|---|
| 32 threads | 154.65 | 59.54 |
| 12-core affinity | 98.55 | 59.35 |
That is 36.3% less CPU time per 1,000 frames at nearly the same frame throughput. It is a controlled short test, not a promise for all city sizes and load states.
Later, live operation with 12 cores showed a drop in frame rate to the mid-50s. The building agent reverted to 32 threads, and a later reading showed a higher rate. These two operating windows come from different load conditions and alone do not prove that the reversal raised performance. A planned restart interrupted the game for close to an hour in the evening because the launcher was waiting for a continuation; only afterwards was the game loaded again.
Status and open points
For 29 September there are no qualified watchdog readings for the contractual performance series; the separately delivered performance file marks this gap and contains no invented points. The CPU windows above come from operating records captured differently and do not replace that series. The population file has been transferred, but the website's adoption of it was not yet confirmed at the time of the report.
Unemployment rate, as far as read. Unemployment rate (%) from the published series, 21 readings from 28 September 2026 to 29 September 2026.