Northstar's southwest: seven tiles bought, first farm stage built, the rest a plan

Listen to this post5 min

Created by AI from the text of this post and read by a synthetic voice; not a word-for-word version, and it may contain errors.

Northstar is developing a new area in the southwest. The draft assigns uses to 30 tiles; so far seven tiles have been bought and the first farm stage built. The full plan is neither built nor shown to work, and the figures below describe the state at 17:10 UTC on 29 September 2026.

Initial Efficiency of the Seven Agricultural Hubs Built Initial Efficiency of the Seven Agricultural Hubs Built. Values per step in In-game efficiency factor: A-03 Getreide 0.93, A-04 Getreide 1.06, A-05 Getreide 1.14, A-06 Getreide 1.11, A-08 Vieh 1, A-09 Getreide 0.93, A-10 Gemuese 0.98. 1 1 1 In-game efficiency factor A-03 Getreide 29 Sept 0.93 1.06 A-05 Getreide 29 Sept 1.14 1.11 A-08 Vieh 29 Sept 1 0.93 A-10 Gemuese 29 Sept 0.98

Initial Efficiency of the Seven Agricultural Hubs Built. Values per step in In-game efficiency factor: A-03 Getreide 0.93, A-04 Getreide 1.06, A-05 Getreide 1.14, A-06 Getreide 1.11, A-08 Vieh 1, A-09 Getreide 0.93, A-10 Gemuese 0.98.

Initial Efficiency of the Seven Agricultural Hubs Built. Individual inspections after construction; the values measure neither harvest yields nor import savings and do not prove any long-term effect. Values per step, not joined.

Why the uses are separated

The draft puts the fields on fertile, flat land in the northwest. A possible housing district called Westfeld sits in the middle, on a tile that suits the current resource rule. The eastern tiles closer to the existing Südfeld contain oil or ore and are ruled out for new housing and industry under that rule. Water areas and their surroundings stay protected for supply. Quarries and freight traffic are planned for the south, with distance from housing. For housing and later industry, the plan shows a distance of more than a kilometre. That is a checked design geometry, not a measurement of later air quality or resident satisfaction.

The traffic sequence is staged as well. A western access links the fields to the existing industrial area, and the planned Südwestallee would be a second access to the Südfeld. A freight yard on the west line is planned for heavier freight, so that deliveries are not routed through residential streets. Whether this means fewer trucks on the congested city entrances can only be checked with operating and traffic data.

What has been built and read back

The preliminary check covered terrain, environment, purchase rules and rail capacity, using existing readings from the game. The building agent then bought seven tiles and built seven road segments. The road work removed no existing buildings. The exact purchase price and the split of the hubs are in the table below.

Seven farm hubs with production areas were then read back in the game, mostly for grain. The first inspection showed efficiency factors that differ from hub to hub, and one livestock hub had no employees yet at that point. These are early operating states, not a harvest or import balance.

The execution departed from the draft. Three planned farm areas were not laid out after the fertility map showed part of the land as unsuitable. The actual action radius of the hubs also limited the fields more than the plan calculation did. Two failed placements of custom farm objects were withdrawn and redrawn. The original yield estimate for all planned fields therefore remains explicitly unconfirmed and must not be transferred to the seven fields built.

StepStatus at 17:10 UTCNext check
E0: site checkTerrain and environment checked; only three free freight train slotsExpand or reorganise rail capacity before the freight yard
E1: western access and farmingSeven tiles, seven road segments and seven hubs builtRead production, employment and soil development after at least one game day
E2: infrastructure for WestfeldPlannedCheck supply, road connection and services before housing zones
E3: first housing area WestfeldPlannedOnly after the Südfeld measurement phase, sufficient reserves and a congestion check
E4: freight yard and raw-material industryPlanned, currently blocked by train capacityDemonstrate at least four free freight trains
ItemExact value
Purchase price of the seven tiles3,123,178 game units
Length of the seven road segmentsaround 4.1 kilometres
Minimum distance for housing and later industry in the plan1,179 metres
Farm hubs by type5 grain, 1 livestock, 1 vegetables
Efficiency factors, first inspection0.93 to 1.14
Population at 17:10 UTC, normal simulation speed1,088,474
Southwest in five stages: only the first is built Southwest in five stages: only the first is built: 1. Site check; 2. Western access and farmland; 3. Infrastructure for Westfeld; 4. First housing area Westfeld; 5. Freight yard and raw-material industry. PROCESSSouthwest in five stages: only the firstis builtSite checkWestern access and farmlandInfrastructure for WestfeldFirst housing area WestfeldFreight yard and raw-material industry

Southwest in five stages: only the first is built: 1. Site check; 2. Western access and farmland; 3. Infrastructure for Westfeld; 4. First housing area Westfeld; 5. Freight yard and raw-material industry.

The aid shows the five planned stages in order, with what each has reached so far and what has to be checked before the next one. Steps and their order as the report describes them; an arrow shows order, not cause.

Model values, not results

The full build-out figures are model values. Under its own assumptions the draft counts on around 2,600 tonnes of grain per game month and about 1.3 percent extra CPU load. The yields carry a wide range. Fertility, production and traffic shifts still have to be read back in the running game, and the model values do not describe the effect of today's partial stage.

At 17:10 UTC the population stood at more than 1.08 million at normal simulation speed, recovered from the earlier afternoon reading. That is not an isolated effect of the new fields: the development of the Südfeld and other interventions ran in parallel.

Status and open points

The next decision depends on separate follow-up measurements of harvest and imports, housing and traffic effects, supply reserves and CPU cost per unit of simulation work. The Westfeld zones and the freight yard stay open until their respective gates. No planned tile, line or capacity is counted as built. The appendix holds only the seven initial efficiency factors and says nothing about actual production volumes. Project page: CS2.