Northstar, 15 October: new links, a brief influx and goals still open
Listen to this post9 min
Created by AI from the text of this post and read by the synthetic voice “Sulafat”; not a word-for-word version, and it may contain errors.
Loading…
Created by AI from the text of this post and read by the synthetic voice “Sulafat”; not a word-for-word version, and it may contain errors.Position and speed stay in this browser and are sent nowhere.
The recording could not be played. Open the audio file
On 15 October Northstar extended its links to the outside and between housing and work areas with new train, ship, metro and bus services, a freight port and new industrial zones. A short overnight influx took the city back to about 1.71 million residents. It was not a lasting turnaround: the late city overview showed about 1.55 million.
Points of the resident count of Northstar from the published series, 66 readings: 1,589,081 on 15 Oct 00:03 UTC, last 1,546,514 on 15 Oct 21:58 UTC; lowest 1,546,514, highest 1,710,373.
The report's boundary is the Berlin calendar day of 15 October. All times below are UTC.
The influx did not last
| City overview | 01:30 | 03:30 | 21:56 |
|---|---|---|---|
| Actual residents | 1,575,241 | 1,705,918 | 1,547,496 |
| Citizens in the moving-in status | 1,090,761 | 705,338 | 1,297,464 |
| Unemployment rate | 14.82% | 12.29% | 12.55% |
Between the first two readings the population rose by more than 130,000 while the moving-in stock fell by about 385,000. The two figures differ in size, so they cannot simply be equated: not every citizen who left the waiting group is shown to have arrived as an additional resident. The build log discusses batch processing of the housing search as an explanation. That is a diagnosis, separate from the observed wave. How much of the wave is due to moving in, a changed count, unsuccessful search or other transitions is not resolved by a closed population balance.
The goals set during the day asked, among other things, for two million residents again and lower unemployment. The late values meet neither the population goal nor the stated unemployment band of eight to twelve percent.
Passenger lines and two ports
Three more passenger train lines were actually created in the morning: northwestern station to the west connection, and northeastern station to Salfurt and to the south connection. Preview-only orders are not counted. The evening line overview lists the active passenger train lines, but the new line 5 still had a vehicle shortage at 21:19. A line existing is therefore not the same as a frequent service.
A passenger port was added, with two passenger ship lines to the sea connections in the north and east. The report does not derive an additional influx figure from this. Nor can the gap between all jobs and employed residents alone yield a reliable number of commuters from outside.
The freight port is distinct from the passenger port. Its building and access and sea-route parts are confirmed, and two freight ship routes are listed late in the evening. A freight rail yard in the existing cluster had been considered; according to the building plan it would have needed a longer new track through built-up land. Whether the port lowers the high purchasing costs of certain firms is not shown: continuous supply and cost chains of the same buyers are missing.
Industry: new zones, fewer jobs
In the new area Hafen Nord, a new road network was built and a large area was zoned for processing industry; section A2 added more. These are executed works, not a guaranteed number of staffed jobs.
The job stock fell in the later period despite the new sites, between the first and the last reading. Changes elsewhere and demolished firms are part of that balance. Two office rounds also adjusted cells; a vacancy for the highly educated does not replace a reachable one for less educated unemployed people.
West link: built, no relief shown
In the northern industrial corridor the building agent built the West link from four road pieces, giving up existing industrial buildings for it. For a section at the north access, two original traffic readings exist (native scale from zero to one). The mean flow value fell slightly, but more segments were read and all of them were congested by the second reading.
That is no visible relief in these samples. Because the road set, the industry and the game hour changed, it is also no isolated proof that the link alone worsened traffic. A more detailed build review rated the pre-set success criteria as missed. Signal adjustments at three four-arm junctions failed: the signal component remained despite attempts, so no optimisation is counted.
Metro line 1 and bus line 16
In the evening stations S1 and E were placed and connected. The line change is confirmed at 18:31: line 1 kept its identity and was extended. For station E, two existing residential towers were removed. Their residents had been read shortly before; where those residents went afterwards is not documented.
At 20:23, after trains had been moved onto the line, line 1 showed no vehicle shortage. Moving trains onto line 1 reduced service on another line. The occupancies in the table are momentary, not daily passenger counts and not proof of additional residents.
For the northern cluster a short extra road connection was built before bus line 16, after other proposals failed on existing service buildings. The line was created shortly before the end of the day. In the first reading its momentary occupancy was still zero. That reading supports neither a verdict of failure nor a promise of effect; the planned check of use and unemployment falls mostly after the reporting day.
Services, cash and performance
The problem overview at 20:20 recorded 30 burial symbols; the exact coverage applies to that reading's sample. It is a dated observation and no guarantee of lasting freedom from warnings. Cemeteries continued to be replaced regularly; replacing filled sites is distinct from measured regular handling. In the south a destroyed substation was removed and a new transformer building placed; no full acceptance of the power supply is derived. One cemetery swap broke off between demolition and rebuild, and the replacement was placed separately.
The late cash reading is below the level the city had often reached before, but above the documented target band. Tax changes, running income and expenses, and building costs act together.
For the whole Berlin day of 15 October the verified performance file contains no qualified reading, with a continuous gap from 22:00 on 14 October to 22:00 on 15 October. The cause is unknown. No CPU gain or higher simulation throughput can be derived from other responses.
Exact readings
| Item | Value |
|---|---|
| Active passenger train lines, evening | 5 |
| Line 5, active trains, 21:19 | 2 (vehicle shortage) |
| Passenger port, base build price | 420,000 game money |
| Passenger ship lines, active ships each (late overview) | 2 |
| Freight port, base build price | 490,000 game money |
| Freight ship routes, active ships each (late evening) | 2 |
| Jobs recorded, 19:10 | 973,407 |
| Jobs recorded, 20:25 | 968,408 |
| Jobs recorded, late reading | 964,575 |
| Hafen Nord, road pieces | 23 |
| Hafen Nord, industrial cells | 4,194 |
| A2, industrial cells added | 1,305 |
| Office cells, first round | 154 |
| Office cells, second round | 713 |
| West link section, 16:41: mean flow value / segments read / congested | 0.222 / 15 / 14 |
| West link section, 19:50: mean flow value / segments read / congested | 0.198 / 21 / 21 |
| Metro line 1, 18:31: stops / length | 18 / 19.02 km |
| Residents of the two removed towers, read shortly before | 144 |
| Line 1, 20:20: active trains / momentary occupancy | 8, vehicle shortage / 4,186 passengers |
| Line 1, 20:23: active trains | 10, no shortage, interval shown about 94 seconds |
| Line 1, 21:19: momentary occupancy | 5,779 of 10,800 places |
| Bus line 16: connected stops / length | 9 / 5.28 km |
| Bus line 16, 21:19: active buses / momentary occupancy | 3 / 0 |
| Cash, late reading | 1.446 billion game money |
| Documented cash target band | 0.8 to 1.3 billion game money |
Status
New transport offers are confirmed; a lasting population turnaround and the performance effect remain open. Readings from different times do not form one atomic state. More on the project: CS2.